26.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua The floor slab concrete on the 15th construction (14 hotel) floor is gaining strength and we can begin surveying the columns and installing the fence posts. On the 5th construction (4 hotel) floor the walls are being laid with ceramic block.