26.09.2024 Wyndham Grand Residences Batumi Gonio. Aqua Balcony framing with reinforced concrete edges, waterproofing of balconies, installation of decorative boxes, geodetic works (marking for drilling of engineering holes) and drilling of engineering holes, installation of plasterboard frame of internal partitions are in progress. On the 20th floor ceramic block masonry is in progress. In the mockup on the 13th floor is the construction of a balcony.