26.12.2023 Wyndham Grand Residences Batumi Gonio. Aqua Concreting of columns of the 19th construction (18th hotel) floor has been carried out. Ceramic block walls on the 11th (10) and 12th (11) floors are being laid. - European Village

26.12.2023 Wyndham Grand Residences Batumi Gonio. Aqua Concreting of columns of the 19th construction (18th hotel) floor has been carried out. Ceramic block walls on the 11th (10) and 12th (11) floors are being laid.