27.02.2024 Elite Family Residence Protective wrapping of the installed stained glass windows continues on the floors. Stained glass windows are being installed on the 5th construction (4th residential) floor. Fireplace masonry is underway on the 6th (5th) floor. Improvement of the surrounding area is beginning.