27.08.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A: The formwork installation for the structural wall on the underground floor is in progress. Block E: The formwork of the columns on the 2nd floor is being stripped off. The reinforcement of the stairs continues.