27.08.2024 Elite Family Residence Installation of suspended ceiling profiles, installation of metal railings, umbrellas on ventilation shafts is in progress. Stained glass windows are being installed. Finishing works on the facade and roof ventilation shafts are in progress. On the second floor electrical installation works are in progress, and on the ground floor – plastering of walls of technical premises. Floor tiles are being laid in the mockup bathroom. Railings have been delivered to the site.