28.08.2023 Wyndham Grand Residences Batumi Gonio. Aqua The surveyor’s layout for column reinforcement was completed on the 13th construction (12th hotel) floor. The guiderails are being installed. The walls construction continues on 2nd (1) and 3rd (2) floors.