28.10.2023 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab of the 17th construction (16 hotel) floor continues. On floors 6 (5) and 7(6), the walls are being masoned with ceramic block. Building materials are being loaded onto the floors.