29.08.2023 Wyndham Grand Residences Batumi Gonio. Aqua The reinforcement of the columns and the guiderail installation continue on the 13th construction (12th hotel) floor. The lightening is being installed on the 10th (9th) floor. The walls construction is in progress on 2nd (1) and 3rd (2) floors.