29.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua Balconies are being framed with reinforced concrete curbs, balconies are being waterproofed, ceilings are being dusted, gypsum cardboard framework of internal partitions is being installed, diamond drilling of engineering holes in floor slabs, waterproofing of holes for utilities, geodetic layout. On the 20th floor the masonry of ceramic block walls continues. ВIn the mockup finishing works are in progress. Translated with www.DeepL.com/Translator (free version)