30.10.2023 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab of the 17th construction (16th hotel) floor has been completed and concreting has been carried out. Ceramic block wall masonry continues on floors 5 (4), 6 (5) and 7 (6).