31.07.2024 Elite Family Residence Installation of heating systems, cold/hot water supply and GKL frames in common areas is in progress. Painting works on the mocap and on 2 construction (1 residential) and 3 (2) floors, as well as installation of sub-sockets are in progress. Materials have been delivered for works on the water fire extinguishing system.