31.07.2024 Wyndham Grand Residences Batumi Gonio. Aqua On the 1st construction (Ground Floor) floor the walls are being laid with ceramic block. Balcony framing is in progress. Dusting of ceilings in common areas and installation of windows of the standard floor is in progress. Earthworks are being carried out on Aqua+.