31.10.2023 Wyndham Grand Residences Batumi Gonio. Aqua On the 17th construction (16 hotel) floor, the breaking of column axes has begun. On the 7th (6th) floor, masonry walls continue to be laid with ceramic block. Logging and loading of materials onto the floors continues.