Elite Family Residence 1. Finishing work. — Installation of moldings. — Laying porcelain tiles. — Painting work, 5th floor. — Facing travertine on balconies. 2. Facade works. 3. Arrangement of the railing of the central facade. Painting of balusters. 4. electrical installation works. 5. Installation of interior doors. - European Village

Elite Family Residence

1. Finishing work.
— Installation of moldings.
— Laying porcelain tiles.
— Painting work, 5th floor.
— Facing travertine on balconies.

2. Facade works.

3. Arrangement of the railing of the central facade.
Painting of balusters.

4. electrical installation works.

5. Installation of interior doors.