Elite Family Residence 1- Finishing work. — Painting works in the units, 5th floor. — Laying porcelain tiles on balconies and terraces. — Installation of moldings. — Grouting of tiles on terraces. 2. Facade works. Facing with natural stone. 3. Installation of the railing of the central facade. - European Village

Elite Family Residence

1- Finishing work.
— Painting works in the units, 5th floor.
— Laying porcelain tiles on balconies and terraces.
— Installation of moldings.
— Grouting of tiles on terraces.

2. Facade works.
Facing with natural stone.

3. Installation of the railing of the central facade.