Elite Family Residence 1. Finishing works. — Marble facing of staircase steps. — Installation of moldings and skirting boards on the 2nd, 4th floors. — Puttying and plastering of walls and ceilings in the units, the 3rd- 5th floors. — Floor tiling in the common areas, the 1st, 2nd, 4th floors. — Installation of marble skirting boards on the staircases. — Floor tiling and bathroom tiling, penthouses. — Plastering of the staircases. 2. Facade works. — Painting of the balconies of the central facade. — Decorative plastering of balconies of the central facade. — Priming of balconies of the central facade. 3. Plumbing. Installation of shower bases, the 5th floor. 4. Installation of staircases railings. 5. Drywall frame installation. - European Village

Elite Family Residence

1. Finishing works.
— Marble facing of staircase steps.
— Installation of moldings and skirting boards on the 2nd, 4th floors.
— Puttying and plastering of walls and ceilings in the units, the 3rd- 5th floors.
— Floor tiling in the common areas, the 1st, 2nd, 4th floors.
— Installation of marble skirting boards on the staircases.
— Floor tiling and bathroom tiling, penthouses.
— Plastering of the staircases.

2. Facade works.
— Painting of the balconies of the central facade.
— Decorative plastering of balconies of the central facade.
— Priming of balconies of the central facade.

3. Plumbing.
Installation of shower bases, the 5th floor.

4. Installation of staircases railings.

5. Drywall frame installation.