Elite Family Residence 1. Finishing works. — Painting on the staircases and in the units, the 1st floor. — Porcelain stoneware installation in common areas, penthouses, the 5th floor. — Marble facing installation on the staircases. — Ceiling painting, the 4th floor. 2. Facade works. — Cladding the facade with natural stone. — Installation of the railings of the central facade. 3. Plumbing. 4. Wiring — Installation of lighting fixtures, the balconies of the 1st floor. 5. Installation of staircases railings. 6. Installation of the drywall frame. Drywall installation for elevator gantries. - European Village

Elite Family Residence

1. Finishing works.
— Painting on the staircases and in the units, the 1st floor.
— Porcelain stoneware installation in common areas, penthouses, the 5th floor.
— Marble facing installation on the staircases.
— Ceiling painting, the 4th floor.

2. Facade works.
— Cladding the facade with natural stone.
— Installation of the railings of the central facade.

3. Plumbing.

4. Wiring
— Installation of lighting fixtures, the balconies of the 1st floor.

5. Installation of staircases railings.

6. Installation of the drywall frame.
Drywall installation for elevator gantries.