Elite Family Residence 1. Finishing works. — Painting, the 1st, 3rd, 5th floors. — Laying of porcelain stoneware on elevator portals. — Installation of marble wind sills. — Laying marble on staircases. — Installation of moldings. 2. Waterproofing. — On the balconies. 3. Installation of railings on the staircases. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Laying of porcelain stoneware on elevator portals.
— Installation of marble wind sills.
— Laying marble on staircases.
— Installation of moldings.

2. Waterproofing.
— On the balconies.

3. Installation of railings on the staircases.