Elite Family Residence 1. Finishing works. — Painting, the 1st, 3rd floors. — Laying of porcelain stoneware on elevator portals. — Marble cladding for the fire places, the 5th floor. 2. Facade works. 3. Installation of the staircase railings. 4. Insulation system installation. 5. Wiring. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 1st, 3rd floors.
— Laying of porcelain stoneware on elevator portals.
— Marble cladding for the fire places, the 5th floor.

2. Facade works.

3. Installation of the staircase railings.

4. Insulation system installation.

5. Wiring.