Elite Family Residence 1. Finishing works. — Painting, the 3rd, 5th floors. — Laying of porcelain stoneware on elevator portals. — Laying of porcelain stoneware in units on the 5th floor. — Laying marble on staircases. — Laying of porcelain stoneware on elevator portals. 2. Facade works. — Facade cladding with natural stone. 3. Insulation. On the terraces. Installation of reinforcing mesh. 4. Floor screeding. On the balconies. 5. Installation of railings on the staircases. 6. Wiring. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 3rd, 5th floors.
— Laying of porcelain stoneware on elevator portals.
— Laying of porcelain stoneware in units on the 5th floor.
— Laying marble on staircases.
— Laying of porcelain stoneware on elevator portals.

2. Facade works.
— Facade cladding with natural stone.

3. Insulation.
On the terraces. Installation of reinforcing mesh.

4. Floor screeding.
On the balconies.

5. Installation of railings on the staircases.

6. Wiring.