Elite Family Residence
1. finishing works.
— Painting works in units, 1st, 2nd floor.
— Painting in common areas.
— Laying of tiles, 5th floor.
— Laying of porcelain tiles in the bathrooms.
— Laying porcelain tiles on the terraces.
2. Facade works.
Facing the facade with natural stone.
3. Plumbing works.
Installation of revision hatches on bathrooms.
4. electrical works.
— Internet cable laying.
— Installation of video surveillance cameras in common areas.
5. Installation of railings on the staircases.
6. Work on the device of floor screed.
On the balconies.
7. Improvement of the territory, infrastructure.
— Reinforcement of the waterfall base plate.
— Arrangement of pipes for waterfall circulation.
— Preparatory work for stone lining of the pool wall.