Elite Family Residence 1. Finishing works. — Porcelain stoneware installation in common areas. — Installation of porcelain stoneware skirting board, the 1st, 2nd, 4th floors. — Puttying the ceiling, the 4th floor. — Installation of moldings, the 4th floor. — Marble facing installation on the staircases, the 5th floor. 2. Facade works. — Cladding the facade with natural stone. — Installation of the railings of the central facade. 3. Plumbing. 4. Wiring — Starting up the ventilation system. — Setting up the elevator. — Heating start-up, 3rd floor. — Installation of sockets on balconies, the 5th floor. 5. Installation of staircases railings. - European Village

Elite Family Residence

1. Finishing works.
— Porcelain stoneware installation in common areas.
— Installation of porcelain stoneware skirting board, the 1st, 2nd, 4th floors.
— Puttying the ceiling, the 4th floor.
— Installation of moldings, the 4th floor.
— Marble facing installation on the staircases, the 5th floor.

2. Facade works.
— Cladding the facade with natural stone.
— Installation of the railings of the central facade.

3. Plumbing.

4. Wiring
— Starting up the ventilation system.
— Setting up the elevator.
— Heating start-up, 3rd floor.
— Installation of sockets on balconies, the 5th floor.

5. Installation of staircases railings.