Elite Family Residence
1. Finishing works.
— Porcelain stoneware installation in common areas.
— Installation of porcelain stoneware skirting board, the 1st, 2nd, 4th floors.
— Puttying the ceiling, the 4th floor.
— Installation of moldings, the 4th floor.
— Marble facing installation on the staircases, the 5th floor.
2. Facade works.
— Cladding the facade with natural stone.
— Installation of the railings of the central facade.
3. Plumbing.
4. Wiring
— Starting up the ventilation system.
— Setting up the elevator.
— Heating
— Installation of sockets on balconies, the 5th floor.
5. Installation of staircases railings.