Elite Family Residence.

1. Installation of porcelain stoneware tiles, penthouses.
— Continued porcelain stoneware tiling.

2. Finishing works.
— Finishing works, on the 1st — 2nd floors.
— Tiling on the terraces the 3rd — 5th floors.
— Installation of moldings and skirting boards.
— Marble facing of staircase steps.

3. Facade works.
— Painting of the balconies of the central facade.

4. Wiring.

5. Elevator installation.
Ongoing works.

6. Installation of polyurethane railings of the central facade, the 3rd floor.

7. Drywall frame installation.

8. Installation of fire safety doors.