Elite Family Residence

1. Installation of porcelain stoneware tiles, penthouses.
— Continued porcelain stoneware tiling.

2. Finishing works.
— Painting the 1st coat, on the 1st — 2nd floors.
— Tiling on the terraces the 3rd — 5th floors.
— Installation of moldings and skirting boards.
— Marble facing of staircase steps.

3. Facade works.
— Painting of the balconies of the central facade.

4. Wiring.

5. Elevator installation.
Ongoing works.

6. Installation of polyurethane railings of the central facade, the 3rd floor.