Elite Family Residence1. Installation of firefighting and alarm systems. 2. Plumbing. – The laying of heating mains in common areas has been completed. – Air condition installation in the units on the 3rd floor. – Installation of finish plumbing fixtures in units on the 4th floor. – Commissioning of temporary heating system. 3. Electrical installation. Marking and preparation of mounting openings in the ceiling for light fixtures on the 4th residential floor have been completed. 4. Installation of ceramic granite tiles in bathrooms, in units on the 3rd floor. Grouting of tiles. 5. Finishing works. – Painting in units on the 3rd floor. – Installation of drywall ceilings in penthouses. – Smoothing and priming of walls in units on the 2nd floor. – Marble cladding of interfloor landings. – Floor tiling on loggias. – Installation of floor skirting boards. – Patching of walls and ceilings in the units. 6. Facade works. Installing decorative elements to enhance the building’s visual appeal and ensure exterior durability. 7. Installation of steel ladder to the roof.