Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Installation of
The ledges are being formworked and reinforced for stained glass windows to be installed.
2. Diamond core drilling for engineering openings.
Marking and drilling of precise openings for the installation of utilities in the future hotel.
3. Installation of drywall frames, the 1st floor.
Installation of guides for drywall partition frames.
4. Stained glass window installation,
On the 1st floor.
5. Facade works.
Plastering on the 1st floor.
6. Installation of stormwater drainage system
On the balconies.
Building B.
1. Masonry work.
Ceramic block installation on the 4th floor.