Elite Family Residence1. Plumbing. 2. Installation of ceramic granite tiles on the balconies Continued ceramic granite tiling work. 3. Finishing works. – Finishing of penthouses, on the 5th floor. – Painting of the stairwells. – Puttying of walls and ceilings in units, 1st–4th floors. – Tiling in units, 1st–2nd floors. – Tile grouting on loggias, 3rd floor. – Marble flooring in penthouses. 4. Facade works. – Plastering of the balconies. – Decorative elements are being installed. 5. Electrical installation. 6. Installation of the smoke extraction system. – Installation of dampers. – Integration of firefighting and smoke extraction systems. 7. Cast-in works for the entrance group. Concreting of the entrance group of the back yard. 8. Installation of unit entrance doors. Going on. 9. Welding of elevator hinges.