Elite Family Residence1. Plumbing. 2. Installation of ceramic granite tiles on the balconies of the units. Continued ceramic granite tiling work. 3. Finishing works. – Painting of walls and ceilings in the units. – Installation of drywall ceilings and partitions on the 6th floor. – Finishing works, the 5th floor. 4. Installation of the smoke extraction system Installation of smoke extraction ducts. 5. Installation of the AWFS Installation of the automatic water fire suppression system. Due to adverse weather conditions, no other construction works are being carried out on the site today.