Elite Family Residence1. Plumbing. – Heating connection, monitoring of temporary heating. – Installation of drainage system on balconies on the 4th – 5th floors. 2. Installation of ceramic granite tiles in bathrooms, units on the 3rd floor. Continued ceramic granite tiling work. 3. Finishing works. – Finishing works in the units on the 1st floor. – Marble cladding of staircase flights. – Installation of drywalls on the 6th floor. 4. Facade works. – Installation of decorative elements on the balcony parapets. 5. Cast-in works on the entrance group of the rear courtyard. 6. Installation of steel railings on the balconies.