Elite Family Residence1. Plumbing. – Installation of drainage system on balconies. 2. Installation of ceramic granite tiles on the balconies and in bathrooms of the units. Continued ceramic granite tiling work. 3. Finishing works. – Final wall skim coating on the 2nd – 4th floors. – Installation of drywall ceilings and partitions on the 6th floor. – Marble cladding of stairways. 4. Facade works. – Installation of decorative elements on the balcony parapets. – Filling joints of decorative elements on the eastern facade. 5. Cast-in works on the entrance group of the rear courtyard. 6. Installation of decorative MDF panels in residential units. In accordance with the design project. 7. Waterproofing of the terraces. 8. Firefighting system installation Installation of the smoke extraction system. 9. Installation of entrance doors in the units.