Wyndham Grand Batumi Gonio. Family Club.Building A 1. Ceramic block installation, the 1st floor. The ceramic blocks are being installed following the technology. 2. Facade works. Plastering of inner walls. Building B. 1. Ceramic block installation, the 4th floor. The ceramic blocks are being installed following the technology. Due to weather conditions, the construction works on the site are limited today.