Wyndham Grand Batumi Gonio. Aqua 1. diamond drilling of engineering holes, 8th and 10th floors The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel. 2. Mocap arrangement, 12th floor Allows visualization and verification of the design and materials of the hotel room. 3. Facade works Works on the facade on the 5-6 floors. 4. Installation of decorative boxes Design and construction of frame structure, use of finishing materials, also secure fastening to ensure durability and safety.