Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems, 6th and 12th floors.
Electrical work, installation of electrical cables, clips, and fire valves.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Plastering works.
Application of decorative plaster to balconies.
4. Facade works.
Plastering of the facade.
5. Drilling of engineering holes.
For the installation of engineering systems.
6. Installation of plasterboard frame.
Installation of ceiling frame.
7. Infrastructure building.
— Monolithic work, installation of formwork for the 4th floor slab.
— Laying ceramic blocks.