Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Electrical installation work.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Drilling of engineering holes.
For further installation of engineering networks.
4. Plastering work.
Application of decorative plaster to balconies.
5. Finishing work.
Laying tiles on balconies.
6. Installation of plasterboard frames.
Installation of ceiling frames.
7. Infrastructure building.
Monolithic work, concreting of floor slabs, 3rd floor.