Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Electrical installation work.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Plastering work.
Application of decorative plaster to balconies.
4. Finishing works.
Laying tiles on balconies.
5. Installation of plasterboard frames.
Installation of ceiling frames.
6. Infrastructure building.
Monolithic works, installation of wall formwork, pouring of walls and columns on the 4th floor.