Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Electrical installation work, electrical cable installation, 6th floor.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Drilling of engineering holes.
For further installation of engineering networks.
4. Plastering work.
Application of decorative plaster to balconies.
5. Installation of plasterboard frames.
Installation of ceiling frames.
6. Masonry work, 1st floor.
Block laying.
7. Workshop work.
Manufacture of embedded parts.
8. Infrastructure building.
Monolithic work.