Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, 13th and 14th floors.
— Installation of fire extinguishing system, floors 6–20.
— Sealing of ventilation openings.
2. Plastering works.
Installation of decorative plaster on balconies.
3. Ceiling installation work,
Installation of ceiling frames on balconies, covering of frames.
4. Facade work.
Plastering of the facade.
5. Infrastructure building.
Concreting of floor slabs, 5th floor.