Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Electrical work.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Plastering work.
Application of decorative plaster to balconies.
4. Facade work.
Plastering of the facade.
5. Drilling of engineering holes.
For the installation of engineering systems.
6. Installation of plasterboard frames.
Installation of ceiling frames.
7. Infrastructure building.
Monolithic work, installation of formwork on the 4th floor.