Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Electrical work, connection of valves,
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Plastering work.
Application of decorative plaster to balconies.
4. Finishing works.
Tiling of balconies.
5. Installation of plasterboard frames.
Installation of ceiling frames.
6. Infrastructure building.
Monolithic works, reinforcement of walls on the 4th floor.