Wyndham Grand Batumi Gonio. Aqua. 1. Installation of engineering systems. — Electrical work, laying electrical cables. — Plumbing work. — Installation of air conditioning system. 2. Plastering work. Installation of decorative plaster on balconies. 3. Installation of plasterboard frame. Installation of inter-unit partition frames, frame sheathing. 4. Finishing work, 19th floor. Tiling on balconies. 5. Facade work. Plastering of the facade. 6. Roof work. Binding of posts. 7. Installation of a panoramic elevator. Installation and reinforcement of panoramic elevator slabs. 8. Infrastructure building. — Reinforcement of floor slabs, 6th floor. — Laying of ceramic blocks, 2nd floor. - European Village

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, laying electrical cables.

— Plumbing work.

— Installation of air conditioning system.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame.

Installation of inter-unit partition frames, frame sheathing.

4. Finishing work, 19th floor.

Tiling on balconies.

5. Facade work.

Plastering of the facade.

6. Roof work.

Binding of posts.

7. Installation of a panoramic elevator.

Installation and reinforcement of panoramic elevator slabs.

8. Infrastructure building.

— Reinforcement of floor slabs, 6th floor.

— Laying of ceramic blocks, 2nd floor.