Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, laying electrical cables.
— Plumbing work.
— Installation of air conditioning system.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame.
Installation of
4. Finishing work, 19th floor.
Tiling on balconies.
5. Facade work.
Plastering of the facade.
6. Roof work.
Binding of posts.
7. Installation of a panoramic elevator.
Installation and reinforcement of panoramic elevator slabs.
8. Infrastructure building.
— Reinforcement of floor slabs, 6th floor.
— Laying of ceramic blocks, 2nd floor.