Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Electrical work. — Plumbing work. 2. Plastering work. Installation of decorative plaster on balconies. 3. Ceiling installation work. Installation of ceiling frames on balconies, covering of frames. 4. Finishing work, 19th floor. Laying tiles on balconies. 5. Drilling of engineering holes. For subsequent installation of engineering systems. 6. Facade work. Application of rough plaster on the facade. 7. Installation of balconies for the panoramic elevator. 8. Infrastructure building. — Installation of formwork for floor slabs, 5th floor. -Laying ceramic blocks, 1st floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Ceiling installation work.

Installation of ceiling frames on balconies, covering of frames.

4. Finishing work, 19th floor.

Laying tiles on balconies.

5. Drilling of engineering holes.

For subsequent installation of engineering systems.

6. Facade work.

Application of rough plaster on the facade.

7. Installation of balconies for the panoramic elevator.

8. Infrastructure building.

— Installation of formwork for floor slabs, 5th floor.

-Laying ceramic blocks, 1st floor.