Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of a fire extinguishing system. — Installation of a ventilation system. 2. Facade work. Facade plastering. 3. Plastering work. Installation of decorative plaster on balconies. 4. Installation of plasterboard frame. Cladding of inter-unit partition frames. 5. Drilling of engineering holes. For subsequent installation of engineering systems. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

— Installation of a fire extinguishing system.

— Installation of a ventilation system.

2. Facade work.

Facade plastering.

3. Plastering work.

Installation of decorative plaster on balconies.

4. Installation of plasterboard frame.

Cladding of inter-unit partition frames.

5. Drilling of engineering holes.

For subsequent installation of engineering systems.