Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work.
— Plumbing work.
— Installation of air conditioning pipes.
2. Installation of plasterboard frame.
Installation of frame for
3. Finishing works, 8th,
Laying tiles on balconies.
4. Infrastructure building.
— Reinforcement of vertical structures, 8th floor.
— Laying ceramic blocks, 4th floor.