Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Electrical work.
— Plumbing work.
— Installation of fire extinguishing system.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Plastering work.
Installation of decorative plaster on balconies.
4. Installation of plasterboard frame.
Cladding of
5. Finishing work.
Laying tiles on balconies.
6. Drilling engineering holes.
For subsequent installation of engineering systems.
7. Infrastructure building.
Concreting the floor slab of the 4th floor.