Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, wiring.
— Plumbing work, 17th floor.
— Installation of air conditioning pipes, 12th floor.
— Installation of ventilation system.
2. Installation of plasterboard frame,
Installation of frame for
3. Finishing works, 9th floor.
Laying tiles on balconies.
4. Installation of a panoramic lift.
Concreting of panoramic lift slabs.
5. Infrastructure building.
— Concreting of vertical structures, 7th floor.
— Laying of ceramic blocks, 3rd floor.