Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Finishing work.
Laying porcelain stoneware on balconies.
2. Plastering work.
Plastering walls.
3. Facade work.
Facade insulation, installation of mineral wool.
4. Workshop work.
Manufacture of stairs and preparation of material for radius arches on balconies.
Block B
1. Facade work.
Facade insulation, installation of mineral wool on the 2nd and 3rd floors.
2. Elevator shaft installation.
Installation of the reinforced frame for the elevator shaft lintel, concreting of the lintel.
3. Drilling of engineering holes.
For the subsequent installation of engineering systems.