Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of electrical supply system, 20th floor.
— Plumbing works.
2. Diamond drilling of engineering holes, 16th floor.
For the device of engineering systems.
3. Plasterboard frame installation works, 5, 6, 19 floor.
Cladding of the frame.
4. Masonry works, 7–9 floors.
Masonry doorways.
5. Plastering works.
Plastering of balconies.
Other construction works are not carried out at the site due to weather conditions.