Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Installation of electrical supply system, 9, 19, 20 floors. — Installation of water supply system, 13th floor. 2. Facade works. Plastering of the facade. 3. Installation of gypsum plasterboard frame. 4. Work on the roof. Mounting of struts. 5. Finishing works, 2, 3 floors. Laying tiles on the balconies. 6. Work on the floor screed. On the 7th floor. 7. Mocap works, 13th floor. Finishing works. 8. Infrastructure building. Reinforcement of the floor slab. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical supply system, 9, 19, 20 floors.
— Installation of water supply system, 13th floor.

2. Facade works.
Plastering of the facade.

3. Installation of gypsum plasterboard frame.

4. Work on the roof.
Mounting of struts.

5. Finishing works, 2, 3 floors.
Laying tiles on the balconies.

6. Work on the floor screed.
On the 7th floor.

7. Mocap works, 13th floor.
Finishing works.

8. Infrastructure building.
Reinforcement of the floor slab.