Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of electrical system, 11th floor.
— Installation of water supply system, 14th to 15th floor.
2. Facade works.
— Facade insulation on balconies, 12–14 floors.
— Plastering of the facade.
3. Floor screed works.
On the 13th floor.
4. finishing works, 2–3 floor.
Laying ceramic tiles on the balconies.
5. Mocap works, 3rd floor.
Finishing works.
6. Plasterboard frame installation works.
7. Works on the roof of the building.
Manufacturing and installation of columns and racks.
8. Works on the device of elevator shafts.
Masonry works.
9. Diamond drilling of engineering holes, roofing.
For the device of communication systems.